Planning a backyard? Build your design brief in 3 minutes. Start Your Design Brief →
Design Your Backyard

Landscape Design and Landscaping in Orem, UT

Orem has no residential secondary irrigation, so the water on a lawn here is the same treated water that comes out of the kitchen tap, billed on tiered rates. That single fact does more to shape a sensible Orem yard than lot size or taste.

The city began as the Provo Bench, a fruit-growing district that took the name of interurban railroad president Walter C. Orem and incorporated in 1919 largely so it could build a water system. Those orchards became subdivisions along State Street. The ground under them is Lake Bonneville sediment: deltaic sand and gravel from the Provo shoreline sitting over finer lake silt and clay, so east-side lots toward Mount Timpanogos tend to dig gravelly while lots nearer Utah Lake carry finer soil that holds water longer.

Census estimates for ZIP 84057 put the median home's construction year at 1987, and 84097 at 1984. Most Orem projects are therefore renovations of a forty-year-old lawn-and-shrub layout rather than a first install on bare dirt. In 2020 the city cut the share of a front yard that must be green from 75 percent to 50 percent and began crediting shrub and tree canopy toward it, so turf is no longer required to comply.

Given culinary-rate water, Desert & Water-Wise and Modern Minimal plans earn their keep: drip-fed beds, gravel or pavers where grass used to struggle, and a lawn sized for actual use. On the east bench, Mountain Modern stonework suits the gravelly soil and the canyon views. Lay out your priorities in the design brief and it goes to a licensed local design-build pro.

Orem at a Glance

MeasureFigureSource
Elevation (city centre)4,775 ftUSGS EPQS
USDA hardiness zone7a (ZIPs 84057, 84058, 84097)USDA 2023 map via phzmapi.org
Frost depth30 in.Orem adopted codes page
Culinary waterCity of Orem: wells, springs, treated Provo River waterOrem 2022 conservation plan
Secondary waterNone for homesOrem 2022 conservation plan
Owner-occupied63% (84057), 71% (84097), 42% (84058)ACS 2020-2024
Median year built1987 (84057), 1984 (84097)ACS 2020-2024
Median home value$440,200 (84057), $556,300 (84097)ACS 2020-2024

Census rows are ACS 5-year estimates by ZIP; the zone is a ZIP-centroid lookup, so confirm your address on the USDA map.

Permits for Walls, Fences and Covers

Orem's building-safety handout sets the retaining-wall trigger at 4 ft, measured from the bottom of the footing; walls under that are exempt from a building permit. Porch and patio covers and awnings need a building permit, as do decks more than 30 in. above grade, while a one-story shed of 200 sq ft or less on a one- or two-family lot does not.

Residential fences go through a separate fence permit rather than a building permit, unless the fence is masonry or concrete or is combined with a retaining wall. Inside a clear-vision area at a corner, a sight-obscuring fence is held to 3 ft, and a retaining wall in that zone is treated as a fence. Plan retaining walls on corner lots with that in mind.

Rebates and Watering Rules

A 2024 news report said Orem sat outside the state's grass-replacement program; the 2026 Utah Water Savers eligibility list now includes it. Payment is up to a set rate per square foot (the listing for Orem was $1.50 when checked), rates vary by district, artificial turf is not paid, and a pre-approval visit must happen before any lawn comes out. Check utahwatersavers.com before you start. A statewide smart-controller rebate of up to $100 also applies.

City code lets Orem set watering dates and times by resolution. The 2022 plan's shortage step is a request for odd-even watering days; no standing day-and-hour schedule was found in an official source.

Neighborhood Differences

  • Cascade, Canyon View and Orchard (District 1): east bench, gravelly ground, canyon views
  • Northridge, Heatheridge and Windsor (District 3): north Orem
  • Lakeridge and Stonewood (District 7): west side, finer lake-bottom soils toward Utah Lake

Sources

Services available in Orem

Patios & Pavers

Pavers, flagstone and concrete patios built on a base that survives Utah freeze-thaw.

Patios & Pavers →

Retaining Walls

Block and boulder walls that turn a sloped Utah lot into usable flat space.

Retaining Walls →

Outdoor Kitchens & Fire Features

Grill islands, full outdoor kitchens, gas fire pits and fire tables, planned for Utah winters.

Outdoor Kitchens & Fire Features →

Water-Wise Landscaping & Xeriscape

Lawn conversion, xeriscape and Localscapes-style yards, plus how Utah's turf rebates work.

Water-Wise Landscaping & Xeriscape →

Landscape Lighting

Low-voltage LED lighting for paths, steps, walls, trees and the patio you just built.

Landscape Lighting →

Pergolas & Shade Structures

Cedar, steel and louvered pergolas that shade a west-facing patio and stand up to canyon wind.

Pergolas & Shade Structures →

Sports Courts

Pickleball, half-court basketball and multi-sport pads built level, drained and fenced for Utah winters.

Sports Courts →

Putting Greens

Synthetic putting greens with real contours, built into the landscape rather than dropped on the lawn.

Putting Greens →

Water Features

Fountains, pondless waterfalls and spillway walls planned for Utah winters and dry summer air.

Water Features →

Landscape Design Questions From Orem Homeowners

How much does yard landscaping cost in Orem, UT?

Median home values run $440,200 in ZIP 84057 and $556,300 in 84097 (ACS 2020-2024). Our modelled 2026 ranges (not quotes) run from $15,000 to $30,000 for a patio refresh to $30,000 to $75,000 for a full backyard. Orem has no residential secondary water, so every gallon is treated water and a drip-based water-wise yard lowers the running cost.

Do I need a permit for a patio cover or retaining wall in Orem?

Orem's building-safety handout sets the retaining-wall trigger at 4 ft, measured from the bottom of the footing. Porch and patio covers need a building permit, as do decks more than 30 in. above grade, while a one-story shed of 200 sq ft or less does not.

Does Orem have secondary irrigation water for homes?

No. The city's 2022 conservation plan says Orem has no secondary system, so lawns and beds are watered with treated culinary water on tiered rates. Reuse water was being developed only for a few parks and golf.

Do I need a permit to build a fence in Orem?

Yes, a city fence permit, which is separate from a building permit. A masonry or concrete fence, or one combined with a retaining wall, needs a building permit instead, and fences in a corner clear-vision area are held to 3 ft.

Nearby Areas

Design Your Backyard in 3 Minutes

Tap through what you like, what you need and what you want to spend. A licensed local design-build pro gets a clear brief and calls you back with ideas and a real number, not a sales script. Prefer to talk it through? Call (385) 494-2758.

Start Your Design Brief →
Call Design Your Backyard →